Roof Replacement in Downtown Nutley from $9,500. $12,000 to $18,000 on a typical house -- and eight things to look at before the final payment leaves your hand. Free inspection and a written quote.
Mixed-use buildings on the avenue are a different job from the houses behind them: low-slope roofs behind street parapets, internal drainage, and a shop trading underneath. The visible pitch from the sidewalk is usually not the whole roof, and access is the real constraint.
An architectural asphalt roof in New Jersey runs $9,500 to $26,000, and most 2,000 square foot houses land at $12,000 to $18,000 installed. Architectural shingle is $5.50 to $8.00 per square foot against $4.50 to $6.50 for three-tab, and on a house you intend to keep the heavier product is worth the difference.



New Jersey figures for an architectural asphalt roof, with most 2,000 square foot houses landing at $12,000 to $18,000 installed. Architectural shingle is $5.50 to $8.00 per square foot against $4.50 to $6.50 for three-tab -- a few thousand dollars on an average roof, and the clearest case in this trade of a cheaper quote being a lesser roof. Priced as low-slope commercial work rather than as a house. Access through a tenancy, hours that fit a trading business, and a parapet with internal drainage are the real lines -- and the pitch you can see from the sidewalk is usually not the whole roof.
A simple roof shape, a driveway to work from, one existing layer to come off, and a deck that turns out sound. Much of this township qualifies.
Board sheathing that has to be made good rather than nailed into, a second covering to strip, rooms in the roof that complicate the eaves, and roof shapes with more valleys per square foot than modern work has.
How decking replacement is priced. It belongs in the scope as a rate per sheet, because nobody knows how much has softened until the covering is off, and a lump figure is a guess in one direction or the other.
Low-slope roofs behind street parapets with internal drainage, and a business trading underneath -- which makes access and hours the constraint rather than anything about the covering. The visible pitch from the street is usually not the whole roof.
On a building with a shop below, the sequence and the trading hours are as much of the job as the membrane is.
Worth knowing before you start ringing round, because the worst month to be choosing is the month everybody else is.
Roofs in this part of New Jersey fail at the edges over winter. Water backs up under the courses at the eaves, freezes, lifts them, and the ceiling below stains during the first proper thaw -- so the calls arrive in a cluster, in the same two weeks, across the whole township at once.
With a business underneath, the constraint on a repair is rarely the work.
Water into a shop below is somebody's stock as well as somebody's ceiling, so the first call is cover and the second is to whoever trades underneath.
This is where the real flat roofing in Nutley is: behind street parapets on the avenue, with internal drainage and a business trading below.
On the avenue the equivalent detail is usually not a domestic chimney at all but a parapet coping and the upstand behind it.
On a mixed-use building the inspection has to state what was not reachable -- areas behind parapets, sections over a tenancy with no access -- rather than implying a completeness it does not have..
One township, one office. The walkaround is the point.
Plain roofs, where sloppy work shows up fastest.
Heavy canopy. Valleys, gutters and shaded slopes.
Capes with rooms in the roof. Ventilation first.
Mixed use and multi-family. Unit count decides it.
The oldest stock. Board decking and second layers.
The questions that come up, before you have to ask.
Only where it has actually softened, and as a rate per sheet in the written scope rather than a lump guess. On the older stock here the deck is frequently board sheathing rather than plywood, which holds a nail differently, so it is established by lifting and looking before anything is specified on top of it.
Only over one existing layer, on a sound deck. Two coverings is the practical ceiling, and an overlay buries the eaves detail -- so if there was never an ice barrier down there, an overlay guarantees there still is not. In this climate that is the wrong saving.
Labor, usually -- typically more than half the total, and the share rises with pitch and complexity because steep, broken-up roofs take far longer per square foot. But the item that most often moves a final bill away from the quoted figure is different: replacement decking, which nobody can measure until the old covering is off. That is why it belongs in the scope as a rate per sheet rather than a lump sum, and why a quote without one will probably change.
Usually not, on a house. Replacing the roof COVERING on a detached one- or two-family dwelling is ordinary maintenance under N.J.A.C. 5:23-2.7 -- no permit, no notice, no inspection. Nutley has a good deal of two-family housing, so that covers most of the township. Three or more units, an attached building, or anything structural under the covering is a different answer. Unlike most of this county there is one construction office for the whole of Nutley, so there is only one place to ask.
Look at the paperwork rather than the pitch. In New Jersey a home improvement contract over $500 must be in writing and signed, must carry the contractor's legal name and business address, and must give you three business days to cancel -- so a price described as good only for today is not something the law holds you to. Add two practical tests: a deposit that is a large share of the total before any material arrives, and a quote that names no specific materials. A scope that says only 'strip and re-roof' cannot be held to anything.
The details named in the scope, so they are checkable afterwards. A walkaround with you before the balance is mentioned.