Chimney Flashing Repair in Kingsland Manor from $350. The commonest source of a leak -- and the commonest place to find last contractor's caulk. Free inspection and a written quote.
The oldest stacks in the township, with mortar joints eroded enough that counter-flashing has nothing sound to bed into until they are raked and made good. Where the brickwork itself is spent, new metal is being fitted to something that will not hold it.
More recurring leaks start at a chimney than at any other single point on a pitched roof. Step flashing up the sides, the apron at the front, the saddle behind and the counter-flashing let into the mortar are four separate details, and any one of them failing puts water into the roof space.



Flashing repairs at a chimney run $350 to $1,600 in most cases, and this is the commonest single source of a recurring leak on a pitched roof. It is also the classic corner cut, because reusing old metal and caulking round it looks fine from the ground for about a year. The oldest housing in the township, so expect the age of the building to do the work: board sheathing rather than plywood, frequently no ice barrier at the eaves, and often a second covering already laid over the first. Three unknowns, settled by looking.
A single failed detail on sound brickwork -- usually counter-flashing pulling out of a joint, or an apron lifted at one corner.
Mortar. Counter-flashing has to bed into a sound joint, so eroded joints get raked and made good first, and on the oldest stacks in this township there is a great deal more of that than on a post-war one.
Fresh caulk on weathered metal. That means the flashing was reused rather than replaced, and it was almost certainly priced as a replacement.
Age is the variable here and it is not visible from the street. Board sheathing rather than plywood on the older houses, second coverings laid over first ones, and eaves that predate anyone expecting an ice barrier to be there. All three change the job and none is guessable.
On the oldest stock the deck gets checked by lifting rather than by looking, because boards and plywood do not hold a nail the same way.
Worth knowing before you start ringing round, because the worst month to be choosing is the month everybody else is.
Roofs in this part of New Jersey fail at the edges over winter. Water backs up under the courses at the eaves, freezes, lifts them, and the ceiling below stains during the first proper thaw -- so the calls arrive in a cluster, in the same two weeks, across the whole township at once.
The oldest housing in the township, where three things get established before a price: whether the deck is board sheathing, whether an ice barrier was ever fitted at the eaves, and how many coverings are already up there.
Board sheathing changes what a repair can do.
On the oldest houses an emergency can be an open deck rather than a lifted course, particularly where a second covering has been holding the first one down.
Older extensions here often carry a membrane laid over a tired built-up roof that nobody has ever taken off, so the new covering inherits every defect underneath it.
The single most useful thing an inspection settles on the oldest stock is whether the deck is board or plywood, and how many coverings sit on it.
One township, one office. The walkaround is the point.
Plain roofs, where sloppy work shows up fastest.
Heavy canopy. Valleys, gutters and shaded slopes.
Capes with rooms in the roof. Ventilation first.
Mixed use and multi-family. Unit count decides it.
The avenue: parapets, drainage, tenants below.
The questions that come up, before you have to ask.
Because water lands on a rafter and runs along the top of it until something stops it. A stain two rooms from the chimney is entirely ordinary, and it is exactly why patching the ceiling side achieves nothing.
Fresh caulk on weathered metal. New step flashing is bright and obvious against an old stack; reused flashing with a bead run round it looks tidy from the ground and is visible for what it is from an upstairs window next door.
Shingles, up front, by a wide margin -- architectural asphalt at $5.50 to $8.00 a square foot against roughly double that for a decent metal system. Metal lasts substantially longer, so on a house you will keep for thirty years the cost per year can favor it. On a house you will sell in five it does not. The honest framing is cost per year of expected life, and on most houses in this township asphalt wins that comparison comfortably.
Labor, usually -- typically more than half the total, and the share rises with pitch and complexity because steep, broken-up roofs take far longer per square foot. But the item that most often moves a final bill away from the quoted figure is different: replacement decking, which nobody can measure until the old covering is off. That is why it belongs in the scope as a rate per sheet rather than a lump sum, and why a quote without one will probably change.
Eight of them are visible without climbing anything. Shingle courses that wander, or exposure that changes from row to row -- nobody snapped a chalk line. Nail heads showing on the exposed face of a tab, each of which is a hole with a metal plug in it. No starter course under the first row at the eaves or up the rakes. Ridge cap made from three-tab cut into squares on an architectural roof. Valleys with sealant instead of metal. Fresh caulk on old flashing at the chimney, meaning it was reused. No drip edge behind the gutter. And nails and debris left in the garden. Look for all eight before the final payment, not after.
The details named in the scope, so they are checkable afterwards. A walkaround with you before the balance is mentioned.